The objective of the Project is to improve efficiency in gas production and expand gas transmission pipeline capacity in Bangladesh. The Project will install seven wellhead gas compressors in Titas Gas Field, and construct an approximately 181 kilometers, 36-inch gas transmission pipeline traversing Chittagong through Feni to Bakhrabad.
The PIPE of ASTM A671 CC60 CL22 and API 5L PSL2 X65/X70 LSAW STEEL
PIPE A671 is a 15-meter long pair PIPE with a total of nearly 800 tons