Philippines Third Bridge Project in CEBU

Centerway steel co., ltd
l saw pipes,lsaw steel pipe,lsaw pipe

Philippines Third Bridge Project in CEBU

The project is the Cebu Cordova Link Expressway Cross Sea Bridge, with an investment of 30 billion pesos. Construction began in 2018, with a total length of 8.9 kilometers and two lanes in both directions, which can accommodate 50000 cars per day. It connects the city of Cebu to Maidan International Airport, as well as vacation destinations along the way, easing the original congestion and promoting local economic growth and social development.
  • l saw pipes,lsaw steel pipe,lsaw pipe

    Introduce

    Pile pipes are a key component of the project, used to support and reinforce the foundation structure of the cross sea bridge. We provided various specifications and sizes of pile pipes for the project, totaling 4563 tons. All products have passed 100% third-party testing, ensuring the stability and safety of the project's infrastructure.
  • Product Detail

    Product: LSAW STEEL PIPE
    Standard and material: ASTM A709 Grade 36/ A252 Grade 2
    Specifications: 1894 MM X 12MM, 2102 X 16,2602 X 16, LENGTH UP TO 15M
    Application: Bridge Construction

    l saw pipes,lsaw steel pipe,lsaw pipe
We use cookies and other tracking technologies to improve your browsing experience on our website, to show you personalized content and targeted ads, to analyze our website traffic, and to understand where our visitors are coming from,This behavior is in compliance with the user consent policy.